Run the integrated plant from activation through traceable test evidence.
Keep a stable order: confirm devices, activate the plant plan, simulate the response, then measure and report.
Confirm the project inputs
Check communication, compressor models and behavior, I/O modules, topology, point assignments, and the expected test result.
Activate and run the plant
Apply topology to the draft, compile it, review the revision and fingerprint, activate it, then run the integrated plan.
Simulate and measure
Let the external controller write commands while Live System runs the plant, then compare response, timing, warnings, faults, and limits in Control Quality Monitor.
Preserve the evidence
Export the report and retain the application version, .modbussim project, .modbustest plan, I/O map, expected result, and actual result.