Engineering workflow guide for choosing the right test path. This page should stay near the top of the documentation set.
Engineering Workflow

Run the integrated plant from activation through traceable test evidence.

Keep a stable order: confirm devices, activate the plant plan, simulate the response, then measure and report.

Confirm the project inputs

Check communication, compressor models and behavior, I/O modules, topology, point assignments, and the expected test result.

Activate and run the plant

Apply topology to the draft, compile it, review the revision and fingerprint, activate it, then run the integrated plan.

Simulate and measure

Let the external controller write commands while Live System runs the plant, then compare response, timing, warnings, faults, and limits in Control Quality Monitor.

Preserve the evidence

Export the report and retain the application version, .modbussim project, .modbustest plan, I/O map, expected result, and actual result.

Workflow screenshots

Use the localized application views while following this guide.

Engineering Workflow: Workflow screenshots 1
Engineering Workflow — 1
Engineering Workflow: Workflow screenshots 2
Engineering Workflow — 2
Engineering Workflow: Workflow screenshots 3
Engineering Workflow — 3
Engineering Workflow: Workflow screenshots 4
Engineering Workflow — 4